manage.ID - Industrial ID and Labeling System
"Turning factory chaos into one-click compliance"
- Enterprise Software · B2B
- Industrial IoT · PWA
Summary
Licensed enterprise software, tightly coupled with industrial hardware, that centralises and automates product identification workflows across factory floors - bridging the gap between corporate IT systems and production machinery.
manage.ID ingests real-time data from ERP, MES, and WMS systems, transforms it into compliant, print-ready labeling, and routes it directly to connected hardware.
This ensures consistent execution, full traceability, and regulatory compliance (GS1, ISO standards) across distributed production sites and multi-facility operations.
Challenge
Zero tolerance for error in high-pressure industrial environments, where operators work in gloves, under time pressure, and often without IT backgrounds. Every interaction had to be frictionless, every edge case covered, every component scalable.
Solution
A drag-and-drop interface that makes complex compliance workflows feel as simple as starting a production line - literally by dragging an order onto it.

What changed, and how sure I am
Wave 1 = 6 pilot sites. Wave 2 = 9 production sites across food and beverage, pharma and logistics. About 210 operators and 40 process owners.
Day-1 activation
38% to 61%
+23 pts
Share of new sites completing a first production start unaided on day one.
Time to first verified print (new operator)
3 days to 1 day
−2 days
Time from a new operator's first login to their first label that passes verification.
Operator NPS
+22 to +36
+14 pts
Day-30 survey on shared tablets at shift end. n=148 of ~210 operators (70% response).
CSAT (onboarding and support)
4.1 to 4.5 of 5
+0.4
Satisfaction with onboarding and support, 1-5 scale. n=212 responses.
12-month licence renewal
88% to 94%
+6 pts
Share of accounts renewing their licence at the 12-month mark.
Pricing and sales motion also changed.
ARPA (annual revenue per account)
Baseline to +11%
+11%
Average annual revenue per account. Driven by add-on attach rate 14% → 23%.
Renewal and ARPA are shared outcomes. Design influenced them. It did not own them.
Figures are indexed or rounded under NDA. Method and relative change reflect the project record.
The product in one sentence
manage.ID is the layer between corporate IT and the factory floor. ERP, MES and WMS describe what must be labeled. Printers, scanners, PLCs and coders do the labeling. Nothing in between used to own the job, so I designed that “in between.”
The real problem
Labeling has three moving parts: data, layouts and hardware. If any one drifts, a wrong batch number or expiry date ends up on a pallet. Nobody notices until it becomes a recall or a fine.
So the product’s job isn’t “print labels.” Its job is to make a wrong label impossible to produce quietly. That became my design brief.
Who I designed for
- Operators. Gloves, noise, no time. They need one obvious action.
- Production managers. They need to see every line at once and reassign orders fast.
- Quality and compliance. They need proof: who printed what, when, with which data.
- IT and automation. They need integrations, rules and clean data, not buttons.
One interface for all four would have failed all four. I designed one system that shows each role only what it needs to act. Permissions are not a settings page. They shape the product itself.

Design principles I set
Reduce operational complexity. Make routine tasks straightforward and minimize the risk of human error.
Design around real workflows - physical metaphors over abstractions. An order goes onto a line. A step goes into a scenario.
Configure, don’t code. Process owners adapt the system themselves. No IT ticket for every change.
Prove it, don’t claim it. Traceability is a visible feature, not a back-office log.
Degrade gracefully. When something breaks, production keeps moving.
How I measured it
Business outcome
Moved by: Product outcomes
- Day-1 activation
- Time to first value
- Operator 90-day retention
- Support load
Experience outcomes
- NPS
- CSAT
- Ease score (CES)
- Error-free first print
Product outcomes
- Feeds: Renewal and expansion (ARPA)
Moved by: Experience outcomes
Design levers
- Feeds: Renewal and expansion (ARPA)
Moved by: Experience outcomes
- Ease score (CES)
- Error-free first print
- Feeds: Renewal and expansion (ARPA)
Moved by: Experience outcomes
Design levers
- Feeds: Renewal and expansion (ARPA)
Moved by: Experience outcomes
- CSAT
- Error-free first print
Experience outcomes
- Feeds: Operator 90-day retention
Moved by: Design levers
- Feeds: Support load
Moved by: Design levers
- Feeds: Day-1 activation, Time to first value
Moved by: Design levers
- Feeds: Time to first value, Support load
Moved by: Design levers
Design levers
- Feeds: Ease score (CES), Error-free first print
Moves: Experience outcomes
- Ease score (CES)
- Error-free first print
Product outcomes
- Day-1 activation
- Time to first value
- Support load
- Feeds: CSAT, Ease score (CES)
Moves: Experience outcomes
Product outcomes
- Day-1 activation
- Time to first value
- Support load
- Feeds: Error-free first print
Moves: Experience outcomes
- Error-free first print
Product outcomes
- Time to first value
- Support load
- Feeds: NPS, Error-free first print
Moves: Experience outcomes
- NPS
- Error-free first print
Product outcomes
- Time to first value
- Operator 90-day retention
- Support load
- Feeds: NPS, Ease score (CES)
Moves: Experience outcomes
Product outcomes
- Day-1 activation
- Time to first value
- Operator 90-day retention
- Feeds: NPS, CSAT
| Metric | Definition | Source | Cadence | Owner | Result |
|---|---|---|---|---|---|
| Day-1 activation | New sites with a first unaided production start on day one ÷ new sites | Hybrid telemetry, onboarding checklists | Per go-live | Design | 38% → 61% |
| Time to first verified print | First login → first label passing verification, new operators | Onboarding logs | Per operator | Design | 3 days → 1 day |
| Operator 90-day retention | Operators active in week 13 ÷ operators onboarded | Hybrid telemetry | Quarterly | Product | 71% → 78%, +7 pts |
| Operator-caused label errors | Errors traced to operator input per 10,000 labels | Quality audits | Monthly | Quality | 4.6 → 1.9, −59% |
| IT change tickets | IT tickets for workflow changes per site per month | Support-desk tags | Monthly | IT | 6.5 → 2.8, −57% |
| “How do I” support tickets | How-to tickets per 100 operators | Support-desk tags | Monthly | Support | −27% |
| Renewal | Accounts renewing at 12 months ÷ accounts due | Vendor CRM | Quarterly | Sales | 88% → 94% |
| ARPA | Annual revenue ÷ active accounts | Vendor CRM | Quarterly | Sales | +11% over 6 quarters |
Key design decisions
Production start = drag an order onto a line.
A traditional flow is: pick an order, pick a line, confirm, confirm again. I replaced it with a single gesture that matches how operators already think: this order runs on that line. It’s large-target, glove-friendly and hard to misread. The same pattern also covers handover to the warehouse and swapping equipment.

EvidenceMedian 38 s → 9 s (−76%), after the rework in F1Measured
- Hypothesis
- One gesture beats a four-step flow for gloved operators.
- Metric
- Time to start a run
- Method
- Moderated task timing, 12 operators, 2 sites, 2 rounds, plus hybrid telemetry later
- Result
- Median 38 s → 9 s (−76%), after the rework in F1
- Outcome
- Reworked
A widget dashboard, not a fixed screen.
Production sites differ wildly. A single-line food packer and a multi-site pharma network can’t share one layout. Draggable widgets let each role build the overview it needs. Complexity is added by choice, never imposed.

Evidencev1 customisation adoption 12%. After role-based starter layouts: 30-day return 46% → 71%Measured
- Hypothesis
- Role-built overviews raise manager return rate.
- Metric
- 30-day dashboard return
- Method
- Telemetry at hybrid sites, 21 managers
- Result
- v1 customisation adoption 12%. After role-based starter layouts: 30-day return 46% → 71%
- Outcome
- Reworked
Coding scenarios as a visual builder.
Every identification process is a sequence of small steps: validate data, link layout, activate devices, print, verify, log. I turned those steps into a library of reusable blocks. Users assemble a scenario by dragging steps in order. I modelled the underlying flows in BPMN first, so the UI mirrors the logic instead of hiding it. Process owners now change their own workflows without writing code.

Evidence6.5 → 2.8 (−57%)Measured
- Hypothesis
- Process owners self-serve without IT.
- Metric
- IT change tickets per site per month
- Method
- Support-desk tags, 2 quarters before and after
- Result
- 6.5 → 2.8 (−57%)
- Outcome
- Reworked
Layout mapping with drag-and-drop fields.
Linking a database field to a place on a label is the most error-prone task in the product. I made it direct manipulation: drag the field onto the layout. What you see is what will print.

EvidenceNo significant difference overall. Novices −40% errors, experts unchangedMeasured
- Hypothesis
- Direct manipulation cuts mapping errors.
- Metric
- Errors and time on a 20-field layout
- Method
- Comparison test, n=14
- Result
- No significant difference overall. Novices −40% errors, experts unchanged
- Outcome
- No effect
Verification and traceability as part of the flow.
Printing isn’t the end of the process. Scanners confirm readability, data is checked after printing, and every action lands in a searchable history. I designed this as a visible, confident “done” state. For compliance teams it answers the recall question: where exactly did this product go? It also covers aggregation: linking primary, secondary and tertiary packaging layers.

Evidence1.4 → 0.3 (−79%). Recall-trace query: about 3 h by hand → under 5 min in audit drillsMeasured
- Hypothesis
- A visible done state lowers escaped errors.
- Metric
- Errors reaching the pallet per 10,000 labels
- Method
- Quality-team audit sampling, 3 sites
- Result
- 1.4 → 0.3 (−79%). Recall-trace query: about 3 h by hand → under 5 min in audit drills
- Outcome
- Moved the metric
One design system, four product configurations.
manage.ID ships as solution packages with very different shapes:
Connect: A headless print engine inside ERP/MES, with almost no UI.
Select: A full shop-floor interface with dashboards and drag-and-drop.
Sync: The printer itself becomes the interface, with background synchronization.
Control: Coordinated hardware and software for pallet labeling and SSCC management.
The design system had to flex from “no screen” to “full cockpit” without fragmenting. That is why I built it as dev-ready components with strict density rules, not as a page-template kit.

Evidence9 → 4 tickets, −35% build timeMeasured
- Hypothesis
- Strict density rules cut rework.
- Metric
- Design-dev rework tickets per sprint, new-screen build time
- Method
- Jira, 8 sprints before and after
- Result
- 9 → 4 tickets, −35% build time
- Outcome
- Moved the metric
Resilience as UX.
Packages can back each other up: Connect runs automation, Select stays ready as the manual fallback for rework and outages. Sync keeps printing when the network doesn’t. I treated these as design scenarios, not engineering footnotes.
- Connect
- Runs automation
- Select
- Manual fallback for rework and outages
- Sync
- Keeps printing when the network doesn’t

EvidenceSync sites kept printing in all 7 observed outages (small n)Directional
- Hypothesis
- Fallback packages keep lines running.
- Metric
- Continuity during network outages
- Method
- Incident review
- Result
- Sync sites kept printing in all 7 observed outages (small n)
- Outcome
- Directional
PWA for the factory network.
The product is web-based, with permission-controlled access from any device with a browser. A PWA gave consistent behaviour from desktop to tablet without a native-app maintenance burden. It also kept the interface installable and fast on shared floor devices.
Evidence−45% device bugs. Roll-outs from per-device installs to same-dayMeasured
- Hypothesis
- One web codebase cuts device-specific issues.
- Metric
- Device-specific bug tickets, update roll-out time
- Method
- Jira and support desk
- Result
- −45% device bugs. Roll-outs from per-device installs to same-day
- Outcome
- Moved the metric
AI without noise.
Non-technical operators don’t want a chatbot. I designed AI as quiet assistance: personalised scenarios and predictive suggestions surfaced in context, easy to ignore, easy to accept, never blocking the main flow.
EvidenceAcceptance 9% → 31%, scenario build time −18%Measured
- Hypothesis
- Quiet, contextual suggestions beat inline predictions.
- Metric
- Suggestion acceptance, time to build a scenario
- Method
- Telemetry at hybrid sites
- Result
- Acceptance 9% → 31%, scenario build time −18%
- Outcome
- Reworked
Experiment
The test that changed nothing
Hypothesis: a live label preview inside the mapping screen speeds up mapping.
Result: no significant difference overall (n=14, p>0.05). I almost reported it as a win because novices improved.
Segmenting showed the effect: novices made 40% fewer errors, experienced integrators saw no change.
Decision: keep the preview on by default with a toggle for experts.
Lesson: an average can hide two opposite stories. I always segment by experience before I call a test.
Design system for industrial density
Industrial software has the opposite constraint of consumer apps. Screens are dense, but errors are expensive. The system covers drag-and-drop widgets, dashboards, scenario blocks, status and verification states, and role-based variants. All of it is documented in Figma, with handoff notes written for the developers who built it.

The design debt ledger
| Drop-target states differ across Select modules | High | ~18% of “cannot drop” tickets | 3 days | Q2 |
|---|---|---|---|---|
| Amber warning state unreadable under floor glare | High | Accessibility defect, audit remark risk | 1 day | Q1 |
| Two table density variants in legacy screens | Medium | +1 day per new screen | 5 days | Q3 |
| Spacing not tokenised in Sync UI | Medium | Design-dev rework | 2 days | Q3 |
| Scenario block icons duplicated | Low | Minor confusion | 0.5 day | Q4 |
- 15% of one sprint per quarter reserved
- 31 items closed over 8 quarters
- Rework tickets 9 → 4 per sprint
Asking the people on the floor
- Who
- Operators, managers, quality, IT
- When
- Day 30, at shift end
- How
- Shared tablets, 2 questions + 1 open comment
- Response rate
- 70% (148 of ~210)
Why only users, not buyers: the buyer's score measures procurement happiness. The operator's score measures the product.
Wave 1 pilot sites scored +41. Wave 2 sites, chosen at random, scored +31. Pilot partners are friendlier. I report the blended +36 and name the gap.
- CSAT 4.5 / 5 on onboarding and support (n=212).
- Ease score for “start a production run”: 5.9 / 7.
- “I know what to do next” 41
- “Gloves work” 27
- “Wish I could undo faster” 19 (led to the F1 fix)
Open comments told me where the score came from. The score only told me that something moved.
From one gesture to ARPA
- Multi-line drop targets
- More lines and sites per account
- Add-on attach rate (Sync, Control) 14% → 23%
- ARPA +11% over 6 quarters
What I can claim
- Attach rate moved after contextual add-on prompts shipped.
- Accounts exposed to the prompts attached at roughly twice the rate of unexposed accounts. Directional.
What I cannot claim
- Pricing changes and the sales motion moved in parallel.
- I estimate roughly a third of the ARPA change is design-attributable. The estimate is modelled, not isolated.
Fast signals, slow outcomes
Fast days to weeks
- Task success in usability tests 63% → 94% across 2 rounds (n=8 and n=12)
- Time on task
- Day-1 activation
Medium weeks to a quarter
- Support tickets
- IT change tickets
- 90-day retention
Slow quarters
- Renewal
- ARPA
- NPS trend
- Compliance audit remarks
Glove-sized targets, dual-coded status (colour + icon + text) and AA contrast did not move activation in week one. Over three quarters, tickets about unreadable status under glare fell about 60%, and the Lighthouse accessibility score on core screens rose from 74 to 96. Accessibility is a slow metric. I put it on the roadmap with a slow-metric label so nobody cancels it after week one.
What did not work, and what I changed
Confirm-less drag
- What we believed
- Removing the confirmation step makes starts faster and safer.
- What happened
- Week-1 pilot at one site: 7 mis-assigned orders versus about 2 per week baseline, all caught by supervisors.
- Numbers
- 7 → 0.6 mis-assigned orders per week
- What changed
- A 5-second undo toast, line highlight on hover, snap tolerance on drop zones.
Fewer decisions does not mean no safety net. Reversibility replaces confirmation.
Free-form scenario canvas
- What we believed
- A BPMN-style canvas gives power users freedom.
- What happened
- 5 of 8 test participants could not finish a scenario unaided.
- Numbers
- Completion 38% → 88% (n=8)
- What changed
- A linear step builder, with BPMN kept under the hood.
Model in BPMN, do not expose BPMN.
Empty customisable dashboard
- What we believed
- Managers want to build their own overview.
- What happened
- 12% customised within 30 days. The rest returned to a bare default.
- Numbers
- 30-day return 46% → 71%
- What changed
- Role-based starter layouts. Customisation stays optional.
Configurability is a cost. Defaults are the product.
Loud AI suggestions
- What we believed
- Inline predictions help.
- What happened
- 9% acceptance. Operators said the suggestions got in the way.
- Numbers
- Acceptance 9% → 31%
- What changed
- Suggestions only at decision points, easy to ignore.
In industrial work, AI earns attention by being quiet.
Live label preview in mapping
- What we believed
- A live preview inside the mapping screen speeds up mapping.
- Result
- No significant difference overall (n=14, p>0.05). Novices made 40% fewer errors, experts saw no change.
- Numbers
- Overall: flat. Novices: −40% errors
- Decision
- Preview on by default, with a toggle for experts.
An average can hide two opposite stories. Segment before you call a test.
Six stories behind the decisions
Systems
One system, from no screen to full cockpit
- Situation
- Connect has almost no UI, Select is a full cockpit, and they share components.
- Action
- Strict density rules and tokens instead of page templates, a decision log per component, and the design debt ledger.
- Outcome
- New screens built 35% faster.
A design system is a contract with engineers, not a style guide.
Rework tickets 9 → 4 per sprintTeam
Mentoring on a regulated product
- Situation
- Junior designers needed to ship into a compliance-heavy system without breaking it.
- Action
- Weekly 45-minute critique with a written decision log, component ownership from week two, pairing with an engineer on the first release.
- Outcome
- First production component in about 10 days instead of about 5 weeks.
Ownership early, safety nets in place.
~5 weeks → 10 daysTeam
Developer says: impossible
- Situation
- Native drag-and-drop does not work reliably on touch tablets in gloves.
- Action
- I asked what exactly was impossible. It meant expensive, not unfeasible. Full custom library: 3 weeks. Compromise: a pointer-event version with large drop zones and tap-to-place in 4 days. A half-day snap highlight replaced a physics-style drag ghost.
- Outcome
- Operators saw no difference. Tap-to-place doubled as an accessibility fallback.
“Impossible” usually means “expensive”. Offer a cheaper path.
3 weeks → 4 daysMetrics
Defending a number in the room
- Situation
- Leadership questioned a +14 NPS claim.
- Action
- I showed n, response rate, the cohort gap (+41 vs +31), and what the score could not prove.
- Outcome
- The +14 stayed, the claim shrank to what the data supported, and trust went up.
A smaller claim you can defend beats a bigger one you cannot.
NPS +14 ptsStakeholders
The banner request
- Situation
- The sales lead wanted a permanent “Upgrade to Control” banner on the production dashboard.
- Action
- A one-page memo: attention cost (about 12% of a 1366×768 floor terminal), an alternative (a contextual prompt when a user hits a manual pallet-labelling step), three competitor examples.
- Outcome
- Decided in 20 minutes. The contextual prompt shipped.
Executives buy business logic, not design taste.
Decided in 20 minutesStakeholders
Product vs sales on first-run
- Situation
- Product wanted a 3-step first run. Sales wanted a feature tour on screen one.
- Action
- I asked whose metric each served (activation vs trial conversion), moderated a 30-minute session (“what happens to your metric if we do it your way?”), and ran a two-site pilot because on-prem blocks A/B.
- Outcome
- The short first run won activation by +9 pts. The tour moved to an optional sandbox. Trial conversion held.
When two metrics collide, it is a priority conflict, not a design problem. The user gets the last word.
Activation +9 pts| Decision stake | Method | Sample | Time |
|---|---|---|---|
| New interaction pattern (drag-to-start) | Sessions + test rounds | 12 sessions + 2 rounds | 3 weeks |
| Refinement of a verification state | Interviews | 3 interviews | 4 days |
| “What causes these tickets?” | Call with a support engineer | 1 call | 30 minutes |
Process
Research sized to the decision
- Action
- I matched the research effort to the stake of each decision instead of running one method for everything.
Research is decision-sized.
30 minutes, not a surveyAI
AI as leverage, not authority
- Action
- Claude clustered 20+ interview transcripts into JTBD themes in hours. A V0 prototype of drag-to-start was in front of operators in 2 days instead of about 2 weeks.
- Outcome
- Honest miss: the model merged “rework” and “maintenance” jobs. I caught it by checking against raw quotes.
AI drafts, I decide, operators validate.
2 weeks → 2 daysHard calls
“I do not like this design”
- Situation
- A quality manager at a food plant disliked the verification state: “it looks like an alarm”.
- Action
- I turned the emotion into specifics (colour, layout, tone, hierarchy). In their plant, red means line stop. I proposed dual coding (colour + icon + text) and renamed the state. Where a stakeholder insists without a reason, I log the choice and the risk in writing.
- Outcome
- No further objections. Contrast met AA.
I protect the user experience and I do not sabotage the business.
Zero reopened decisionsSystemsRework tickets 9 → 4 per sprint
Systems
One system, from no screen to full cockpit
- Situation
- Connect has almost no UI, Select is a full cockpit, and they share components.
- Action
- Strict density rules and tokens instead of page templates, a decision log per component, and the design debt ledger.
- Outcome
- New screens built 35% faster.
A design system is a contract with engineers, not a style guide.
Rework tickets 9 → 4 per sprintTeamFirst shipped component: ~5 weeks → 10 days
Team
Mentoring on a regulated product
- Situation
- Junior designers needed to ship into a compliance-heavy system without breaking it.
- Action
- Weekly 45-minute critique with a written decision log, component ownership from week two, pairing with an engineer on the first release.
- Outcome
- First production component in about 10 days instead of about 5 weeks.
Ownership early, safety nets in place.
~5 weeks → 10 daysTeam
Developer says: impossible
- Situation
- Native drag-and-drop does not work reliably on touch tablets in gloves.
- Action
- I asked what exactly was impossible. It meant expensive, not unfeasible. Full custom library: 3 weeks. Compromise: a pointer-event version with large drop zones and tap-to-place in 4 days. A half-day snap highlight replaced a physics-style drag ghost.
- Outcome
- Operators saw no difference. Tap-to-place doubled as an accessibility fallback.
“Impossible” usually means “expensive”. Offer a cheaper path.
3 weeks → 4 daysMetricsRenewal +6 pts
Metrics
Defending a number in the room
- Situation
- Leadership questioned a +14 NPS claim.
- Action
- I showed n, response rate, the cohort gap (+41 vs +31), and what the score could not prove.
- Outcome
- The +14 stayed, the claim shrank to what the data supported, and trust went up.
A smaller claim you can defend beats a bigger one you cannot.
NPS +14 ptsStakeholdersAdd-on attach 14% → 23%
Stakeholders
The banner request
- Situation
- The sales lead wanted a permanent “Upgrade to Control” banner on the production dashboard.
- Action
- A one-page memo: attention cost (about 12% of a 1366×768 floor terminal), an alternative (a contextual prompt when a user hits a manual pallet-labelling step), three competitor examples.
- Outcome
- Decided in 20 minutes. The contextual prompt shipped.
Executives buy business logic, not design taste.
Decided in 20 minutesStakeholders
Product vs sales on first-run
- Situation
- Product wanted a 3-step first run. Sales wanted a feature tour on screen one.
- Action
- I asked whose metric each served (activation vs trial conversion), moderated a 30-minute session (“what happens to your metric if we do it your way?”), and ran a two-site pilot because on-prem blocks A/B.
- Outcome
- The short first run won activation by +9 pts. The tour moved to an optional sandbox. Trial conversion held.
When two metrics collide, it is a priority conflict, not a design problem. The user gets the last word.
Activation +9 ptsProcess & AIInterview synthesis: days → hours
| Decision stake | Method | Sample | Time |
|---|---|---|---|
| New interaction pattern (drag-to-start) | Sessions + test rounds | 12 sessions + 2 rounds | 3 weeks |
| Refinement of a verification state | Interviews | 3 interviews | 4 days |
| “What causes these tickets?” | Call with a support engineer | 1 call | 30 minutes |
Process
Research sized to the decision
- Action
- I matched the research effort to the stake of each decision instead of running one method for everything.
Research is decision-sized.
30 minutes, not a surveyAI
AI as leverage, not authority
- Action
- Claude clustered 20+ interview transcripts into JTBD themes in hours. A V0 prototype of drag-to-start was in front of operators in 2 days instead of about 2 weeks.
- Outcome
- Honest miss: the model merged “rework” and “maintenance” jobs. I caught it by checking against raw quotes.
AI drafts, I decide, operators validate.
2 weeks → 2 daysHard callsZero reopened decisions
Hard calls
“I do not like this design”
- Situation
- A quality manager at a food plant disliked the verification state: “it looks like an alarm”.
- Action
- I turned the emotion into specifics (colour, layout, tone, hierarchy). In their plant, red means line stop. I proposed dual coding (colour + icon + text) and renamed the state. Where a stakeholder insists without a reason, I log the choice and the risk in writing.
- Outcome
- No further objections. Contrast met AA.
I protect the user experience and I do not sabotage the business.
Zero reopened decisionsOutcome
- One product serving roles from operator to IT architect, without a separate UI per role.
- A configuration model that scales from one printer to multi-site operations, and a licence model that follows that growth.
- A drag-and-drop interaction language that became the product’s signature. It is now central to the vendor’s own positioning.
- Compliance (GS1 and related standards) treated as visible product behaviour, not a hidden rule engine.
What I took from it
Industrial UX is not “enterprise UX with bigger buttons.” It’s designing for the worst five minutes of someone’s shift. If the product works then, it works everywhere.
What I delivered
- End-to-end UX across the full compliance and labelling workflow - from ERP data ingestion to print verification
- Design system built for industrial density: drag-and-drop widgets, dashboards, coding scenarios, role-based access
- Drag-and-drop production start key UX decision derived from research revealing operators work with gloves and limited attention bandwidth
- PWA implementation ensuring consistent experience across all devices on the factory network
- AI integration UX personalised scenarios and predictive recommendations without overwhelming non-technical operators
- Figma design system with reusable, dev-ready components and full handoff documentation
Core Capabilities
- Figma
- Design system
- BPMN
- Complex flows
- ERP / MES / WMS
- Drag-and-drop UX
- PWA
- Regulatory compliance
- Cognitive load reduction
- AI integration
- Multi-site scalability
* Due to NDA restrictions, some metrics and data (PRV, P/C, T/O, PII/CI) are modified, while design systems, UX flows, and interactions are shown in full.